In the Westland region, technical services provider DAEL constructed a completely new facility, reflecting their ambition and growth. For the electrotechnical installation in this modern building, DAEL sought a partner who not only delivers high-quality materials, but also thinks proactively and provides peace of mind. They found that partner in Stago.
The challenge: reliability under time pressure
DAEL operates across various technical fields such as electrical engineering, energy, climate control, telecom, and technical management. During the construction of their new facility, speed of delivery, quality, and reliability were decisive factors.
“Our daily operations had to continue, so delay was simply not an option,”
– explains Owen, Junior Project Manager at DAEL.
Because of this, DAEL set high requirements for the cable management system: quick to assemble, robust, highly adaptable, and reliable under all conditions. Additionally, the system had to fit into a smart logistical process so that the installation itself could proceed efficiently.
The solution: partnering with a flexible specialist
Stago had previously worked with DAEL on projects, including the Stolze Installatietechniek building. Because of this, a foundation of trust already existed.
“We always think proactively alongside our clients,”
– says Simon from Stago.
“We are accessible, highly skilled technically, and offer the option to take the installation completely off their hands through reliable installation partners.”
This approach proved to be a resounding success. By utilizing external installation partners, the systems were mounted quickly and neatly, keeping the construction schedule tight. Thanks to a robust and completely screwless system, the installation could also be executed faster than with traditional solutions.

The installation process: smooth, swift, and without compromises
Tjarko, Operations Manager at DAEL, was responsible for the execution:
“When installing cable management systems, two things are central to us: ease of installation and reliability. Stago's systems are extremely robust due to the double-folded safety edge and 1mm thickness. And because they are completely screwless, we save a lot of time on site.”
Additionally, he emphasizes Stago's broad portfolio:
“Whether it comes to corners, bends, or spans – you can go in any direction with this system. That makes the work pleasant for the installers and efficient for the project.”
The result: a sleekly finished facility and a strong partnership
The collaboration between DAEL and Stago resulted in a modern and technically advanced building that was fully commissioned within the set deadlines. “When you walk through this facility and see the pride of the DAEL team, you know this is what it's all for,” says Simon. “We are impressed by the end result and look forward to working together again in the future.”
Owen agrees: “We are highly satisfied and especially very happy with a company like Stago, which, just like DAEL, doesn't shy away from a challenge. We also look forward to future projects.”




DAEL
- Date
- 2025
- Segment
- Commercial Buildings
- Products
- Stago cable tray system KG281, cable ladder LB400
- Location
- Maasdijk, The Netherlands